Souriau USA - Case Study
Problem:
The customer wanted to make a 1970's designed annealing machine more reliable and less labor intensive.
Solution:
PKP transformed the old design of a tube type, micro-switch relay logic machine and updated to today's solid state hardware.
Result:
The customer has taken the labor from 5 hours per 8 hour shift down to just 10 minutes for the entire shift. The parts have now been to specification 100% of the time.